For Employers

Interplay Learning

SME Consultant - Data Center Construction

Posted 3 months ago
$50 - $75 per hour
10+ years experience
Apply Now

Please mention DailyRemote when applying

?Not checked yet0100
Resume Match Score

See how much of this job your resume covers, and what’s missing.

Want a recruiter to go through it line by line?

Get professional review

Tailor your resume to this job

One click makes a copy of your resume for this role, scores it against the posting, and proposes edits line by line. Your default resume is never changed.

  • Job match score for this posting
  • Edits you accept or skip, no invented facts
  • Download it when it reads right: TXT free, PDF with Premium

Create a cover letter for this job

Upload your resume and we draft a letter for this exact role, tailored to what it asks for.

  • Tailored to this role
  • Based on your resume
  • Fully editable
AI Summary

Serve as a subject matter expert to advise internal teams on data center construction best practices and industry dynamics. Collaborate with designers and developers to create training content, procedure guides, and VR simulations for skilled trades.


Position: SME Consultant (Data Center Construction)

Pay: $50-75/hr (1099)


Please note this is an hourly contract position with variable hours and is not eligible for company benefits. Work is 100% remote.  Some availability during business hours is needed to attend scheduled Zoom meetings.


SMEs serve as advisors to Interplay and play a key part of our growth by helping us build industry-leading training content to advance the data center industry.


At this time, we are looking for subject matter experts with direct data center construction expertise in one or more of the following areas:

  • Electrical
    • Install switchgear, transformers, generators, UPS systems, power distribution units, busways, panels, grounding, lighting, and receptacles.
  • Network and fiber 
    • Install structured cabling, fiber-optic cable, telecommunications systems, access control, cameras, alarms, and building controls.
    • Terminate, splice, test, label, and certify connections between equipment rooms, racks, and network infrastructure.
  • Rack Installation
    • Assemble, position, anchor, bond, align, and label server racks, install rack accessories and prepare them for power, cabling, and IT equipment.
  • HVAC
    • Install chillers, cooling towers, air-handling units, computer room air conditioners, pumps, piping, ventilation, and controls.
  • Plumbing and Pipefitting
    • Install domestic water, drainage, fuel-gas piping, condenser-water piping, chilled-water piping, and equipment connections.

 

You will play a critical role on the Production Team, working with designers & developers to create and review content for skilled trades training.

 

Why this position:

  • Flexible work hours, remote work
  • Use your expertise to make an impact and provide education
  • Collaborative, supportive team

 

What you'll do:

  • Advise internal teams on industry dynamics and best practices
  • Use your expertise to support content development for VR simulations and eLearning videos
  • Advise on construction and installation
  • Develop and assist in the creation of procedure guides
  • Write and record voiceover scripts and screencasts for videos 
  • Generate valid and reliable test questions/knowledge checks
  • Develop fault scenarios
  • Review courses for accuracy

 

Who you are:

  • Extensive knowledge of Data Center Construction
  • Teaching or training experience is preferred
  • Organized and communicative with the team
  • Desire and ability to collaborate with designers and developers and respond to queries and feedback within 1-2 business days

 

Requirements:

  • Extensive knowledge of subject matter
  • Systematic approach to troubleshooting
  • Research skills
  • Teaching, training or mentoring experience is ideal
  • Computer skills - G-Suite (Google Docs, Sheets, Slides)
  • Camtasia (video tutorial and presentation software), will teach
  • Writing skills for knowledge checks and procedure guides
  • Availability during business hours to attend scheduled Zoom meetings
  • We may ask you to record a video intro for the hiring team if your application looks like a potential match. Instructions will be sent.


Equal Employment Opportunity

Interplay Learning is committed to providing equal employment opportunity (EEO) to all qualified employees and applicants for employment without regard to race, color, religion, gender, sexual orientation, national origin, age, disability, pregnancy, marital status, gender identity or expression, status as a veteran, or any other legally protected characteristic or activity in accordance with applicable federal, state and local laws.

As a federal contractor, Interplay Learning takes affirmative action to consider qualified individuals without regard for disability and protected veterans status.

Individuals with disabilities who need assistance with the application or recruitment process must promptly contact the HR Department to discuss their particular needs.


Interplay Learning does not discriminate against employees or applicants for discussing, disclosing, or inquiring about compensation.


We believe in fostering a welcoming and inclusive workplace and encourage everyone to apply, regardless of background.


Our hiring decisions are guided by skills, experience, and a shared commitment to our values. If you have any questions about our process, we’re happy to provide support and guidance along the way.

 




Automatically Apply to the Best Remote Jobs

Stop the endless job search. Our AI finds and applies to the best jobs for you.

Try it Now
Keep looking

Similar Jobs

See all Remote Others jobs →

AI Trainer

Freelance United Arab Emirates, Argentina, Austria +43 more $60K – $70K Others

Cabinetry Drafter w/ Mozaik Background (Part-time)

Full Time Philippines Others

Accounts Receivable & Collections Supervisor

Full Time United States Others

Business Development Representative (BBS903)

Full Time South Africa Others

QA Tester

Full Time United States Others

Sr Account Executive - Federal

Full Time United States Others
Apply Now

Personalize your Remote Job Search in 3 Easy Steps!

Featuring 223,392+ Jobs in Others

Answer easy questions

Answer easy questions

223,392+ jobs across 15+ categories

Get your best job matches

Get your best job matches

Only hand-screened, legit jobs

Find a remote job faster

Find a remote job faster

No ads, scams, or junk

“I was the first applicant for a remote marketing position that got listed on the company website the same day I applied. Had an interview within 48 hours!”

Sarah J. — Sarah J. · Marketing Manager ★★★★★ Verified