Please mention DailyRemote when applying
See how much of this job your resume covers, and what’s missing.
Want a recruiter to go through it line by line?
Get professional reviewUpload your resume and we draft a letter for this exact role, tailored to what it asks for.
PART I - BIDDING INSTRUCTIONS
1.1 Bidding Options
A single company may bid for this Statement of Work by proposing a personnel to deliver the scope of works outlined in Section 3 and who meets the required qualifications outlined in Section 8 (Qualifications). The Contractor shall provide one (1) qualified Engineering Support personnel profile to deliver the services described in this Statement of Work. Such profile must meet all mandatory technical, professional, and soft skill requirements. The profile shall ensure continuous service delivery, technical consistency, and the ability to support the production, testing, and validation of technical documentation and Service Instructions for the implementation of BRASS Enhancement 1 services across NATO Nations, in accordance with interoperability requirements, relevant STANAGs, and the target architecture defined in BRE1TA.
All work shall be performed as service-based deliverables, with measurable outputs and documented technical artefacts produced under NCIA's supervision and in close coordination with the relevant NATO stakeholders.
1.2 Technical Proposal
Bidders shall include in the Technical Proposal:
The CV of the proposed candidate, clearly indicating relevant experience that demonstrates compliance with the required qualifications (Section 8).
A compliance matrix for the proposed profile, demonstrating how the proposed candidate meets all required qualifications (Section 8), supported by evidence from their professional experience.
As part of the technical evaluation, the proposed candidate shall be interviewed prior to contract award to verify the candidate’s qualifications, experience, and technical competencies against the requirements specified in the Statement of Work.
The interview may be conducted either virtually or in person, as agreed between the Purchaser and the Contractor. Where the interview is conducted in person in Belgium, all travel and related expenses incurred by the candidate shall be borne solely by the Contractor.
The interview shall be conducted by an interview Board appointed by the Purchaser which shall consist of at least two (2) qualified evaluators. Members of the Interview Board shall declare any actual, potential, or perceived conflicts of interest before participating in the evaluation.
During the interview, the proposed candidate shall be required to respond verbally, in English to questions relating to the technical and managerial aspects of the duties and responsibilities described in the SOW. Follow-up questions may be asked for clarifications but shall not materially alter the scope of the assessment.
The Interview Board shall individually assess whether the proposed candidate demonstrates the qualifications, experience, and competencies required to perform the services. Individual assessments shall be consolidated into a consensus evaluation in accordance with the Purchaser’s evaluation procedures and shall be on the basis of compliant / non-compliant.
If the Purchaser determines, based on the interview, that the proposed candidate does not satisfactorily meet the requirements of the SOW, the associated bid may be determined to be technically non-compliant and may be excluded from further consideration.
1.3 Price Basis
Bidders shall provide a monthly fee for the services required during the Base Period (Year 1). All prices shall be quoted in EUR. The monthly fee shall be all-inclusive, incorporating all costs necessary for the delivery of the services, including any travel costs as described in Section 3.
Deliverable: Monthly Fee – Provision of BRASS Enhancement 1 Engineering Support Services. Unit Price in EUR (Bidder Provided): [Bidder to complete]. Quantity for Evaluation: 1.
1.4 Technical compliance
Each bid will be assessed for technical compliance on a per‑profile basis. A bid is considered technically compliant only if the proposed candidate passes the compliance assessment. If the proposed profile is assessed as non‑compliant, the bid will be deemed technically non‑compliant and will not proceed to price evaluation.
Deadline Date: Monday 12 October 2026
Requirement: BRASS Enhancement 1 Engineering Support Services
Location: Offsite and laboratorial work on NATO sites with the policy and under agreement with NCIA. The Purchaser reserves the right to modify the required on-site and remote work ratio during contract execution, based on operational or business requirements.
Period of Performance: Base Period: Commencing as soon as possible, but no later than 1st November 2026, until 31st December 2026.
Year 1: A period of twelve (12) months immediately following the completion of Base Period and continues until 31 December 2027.
Year 2: A period of twelve (12) months immediately following the completion of Year 1 and continues until 31 December 2028.
Required Security Clearance: NATO SECRET
PART II - STATEMENT OF WORK
1. INTRODUCTION AND BACKGROUND
This statement of work (SoW) describes the work to be contracted for Subject Matter Expert (SME) support on the development of joining instructions for the national BLOS APs delivering IP over HF based services to NATO.
The NATO Integrated Mission Services Centre (NIMSC) is responsible for the coordination, planning, and delivery of engineering and operational support capabilities across Mobile CIS Infrastructure, including BRASS services. To ensure the successful implementation, interoperability, and harmonized delivery of BRASS Enhancement 1 services across NATO Nations, including the deployment of national Beyond Line-of-Sight Access Points (BLOS APs), NIMSC requires specialized Engineering Support Services aligned with NATO governance, interoperability requirements, relevant STANAGs, and operational priorities.
Through this Statement of Work (SoW), the NIMSC seeks industry support to deliver Engineering Support Services. The Contractor, through the selected personnel, will provide dedicated engineering support for the preparation, testing, validation, and maintenance of technical documentation and service instructions required for the implementation of BRASS Enhancement 1 services. The support shall ensure alignment with operational requirements, interoperability standards, relevant STANAGs, and NATO policies, while ensuring that BRASS Enhancement 1 services are implemented consistently across Nations, minimizing interoperability risks and supporting harmonized service delivery. Where required, the support shall also include engineering activities related to interoperability assessments and the integration of national solutions to facilitate seamless service delivery across NATO.
The NCIA has been acting as a focal entity for the technical co-ordination to ensure a coherent realization of the Wireless implementations of the CP 9A0101 life-cycle, taking the assigned responsibilities of coordinating the efforts of the various Territorial Host Nations (HNs). Those include consultancy, management and engineering activities in direct support to Strategic Commands (SCs) and the 18 Territorial Host Nations (HNs); as well as, the development of specific tasks considered foundational for a harmonized, integrated, interoperable and security accredited implementation of the capabilities included in the CP 9A0101 activities.
The implementation of BRASS Enhancement 1 and deployment of national BLOS APs will require a deep understanding about NATO HF based service delivery management and its different interdependencies, both to NATO and National infrastructure. In addition to the challenges associated with the deployment of BRASS IP Enhanced System (BRIPES), there will be more demanding ventures related with the integration of non-BRIPES solutions, which require skilled and unbiased consultation and support from NCI Agency to ensure ultimate harmonized and seamless service delivery to MARCOM.
As the service management sophistication and complexity is increasing, with BRASS Enhancements, SCs and MARCOM shall rely on the NCI Agency to support service delivery advice and interoperability related support to harmonize potential inconsistencies and non-conformities on national BLOS APs.
Within this context, Wireless Implementation Management Authority (Wi IMA) requires external engineering support to undertake a set of activities encompassing the configuration, testing, and optimization of the full BRIPES protocol stack under a variety of use cases, together with the development of supporting documentation for Service and Procedural Instructions to ensure consistent and interoperable service delivery.
In addition, given that some Nations may implement solutions other than BRIPES, the required support shall also encompass interoperability testing and integration-related investigations to assess and facilitate coexistence with such alternative solutions.
2. INTENDED BUSINESS OUTCOME
The intended business outcome of this Statement of Work is to ensure the effective delivery of Engineering Support Services, through specialized engineering support, technical documentation, testing and validation activities, and the production of Service Instructions supporting the implementation of BRASS Enhancement 1 services.
Specifically, the main objectives are:
The successful delivery will result in validated technical documentation, tested service configurations, and comprehensive Service Instructions supporting the implementation of BRASS Enhancement 1 services, ensuring interoperability, harmonized service delivery, and alignment with Alliance operational requirements.
3. SCOPE OF WORK
The scope covers BRASS Enhancement 1 Engineering Support Services, including the preparation of technical documentation, engineering analysis, testing and validation of service configurations, interoperability assessments, and the development of Service Instructions supporting the implementation of BRASS Enhancement 1 services across NATO Nations.
The Contractor shall deliver the services in a structured and proactive manner, ensuring alignment with operational priorities, interoperability requirements, relevant NATO standards, and NCIA governance processes. The services shall be delivered through the assignment of one (1) qualified personnel as set out in Section 8.
The assigned personnel shall perform the activities defined herein and contribute to the achievement of the agreed objectives, technical deliverables, and performance targets. The Contractor shall ensure that the assigned personnel:
3.1 Engineering Support Services
The Contractor shall provide BRASS Enhancement 1 Engineering Support Services contributing to the preparation, testing, validation, and harmonized implementation of BRASS Enhancement 1 services across NATO Nations.
This includes, but is not limited to, the following:
Technical documentation development
Testing and validation activities
Service Instructions development
Engineering analysis and technical support
Stakeholder coordination and reporting
3.2 Engineering Support Services Deliverables
The Contractor shall produce and maintain the following deliverables as part of the BRASS Enhancement 1 Engineering Support Services:
All deliverables shall be produced in accordance with NCIA requirements and shall be subject to review and acceptance as part of the service performance validation process.
3.3 Engineering Support Services Delivery Model
The BRASS Enhancement 1 Engineering Support Services shall be delivered using an Agile, sprint-based approach. Each sprint shall produce defined service deliverables that contribute to the intended business outcomes of the contract.
Prior to the commencement of each sprint, NCIA shall determine the sprint priorities, define the required sprint deliverables and establish the corresponding acceptance criteria. The Contractor shall be responsible for planning, managing and executing the activities necessary to deliver the required outputs in accordance with the priorities and acceptance criteria established by NCIA.
3.3.1 Sprint Planning
The objective of the Sprint Planning phase is to enable NCIA to establish the priorities, sprint objectives, required deliverables and acceptance criteria for the upcoming sprint, and to allow the Contractor to develop the Sprint Plan describing how the required outputs will be delivered.
The Contractor shall participate in a monthly Sprint Planning meeting convened by NCIA to:
Based on the sprint objectives, deliverables and acceptance criteria established by NCIA, the Contractor shall develop the Sprint Plan. The Sprint Plan shall describe the implementation approach, planned activities, milestones, dependencies, identified risks and target delivery dates for the sprint. NCIA shall review the Sprint Plan to verify that it adequately addresses the required sprint deliverables and acceptance criteria. Where necessary, NCIA may request revisions to the Sprint Plan prior to the commencement of Sprint Execution. Such review shall not relieve the Contractor of its responsibility for the adequacy of the Sprint Plan or for the successful delivery of the agreed sprint outputs.
The Sprint Plan, together with the sprint objectives, deliverables and acceptance criteria, shall be documented in the Sprint Planning Meeting Minutes.
3.3.2 Sprint Execution
The objective of the Sprint Execution phase is to deliver the sprint outputs defined by NCIA in accordance with the Sprint Plan, while maintaining the required quality standards and providing NCIA with visibility of progress, risks and issues throughout the sprint.
During each sprint, the Contractor shall:
3.3.3 Sprint Review and Acceptance
The objective of the Sprint Review and Acceptance phase is to enable NCIA to assess the completed sprint deliverables against the predefined acceptance criteria, determine whether the contractual outputs have been satisfactorily delivered, evaluate delivery performance and establish the priorities for subsequent sprints.
At the conclusion of each sprint, NCIA shall conduct a Sprint Review meeting with the Contractor to:
The Contractor shall submit the completed sprint deliverables together with supporting evidence demonstrating compliance with the applicable acceptance criteria. Where one or more sprint deliverables do not meet the applicable acceptance criteria, NCIA shall identify the deficiencies requiring correction. The Contractor shall correct and resubmit the affected deliverable(s) within the timeframe specified by NCIA. Acceptance of the affected deliverable(s) shall be confirmed following satisfactory correction and resubmission.
Sprint deliverables shall be considered complete only when satisfying the acceptance criteria established by NCIA and have been formally accepted by NCIA. Formal acceptance confirms satisfactory completion of the agreed sprint deliverables. Acceptance shall be based solely on compliance with the defined acceptance criteria and shall not be based on the level of effort expended by the Contractor.
Acceptance of sprint deliverables shall not, by itself, constitute entitlement to payment. Payment shall be determined in accordance with the Contractor's achievement of the contractual Key Performance Indicators (KPIs) and any applicable Service Credits defined in Section 4.
3.4 Continuous Service Improvement
The Contractor shall:
3.5 Services Reporting
The Contractor shall establish, maintain, and operate a structured reporting framework to ensure full visibility of BRASS Enhancement 1 Engineering Support Services, technical documentation development, testing and validation progress, Service Instructions development, and compliance with the requirements of this Statement of Work (SoW).
3.5.1 Sprint Performance Report
The Contractor shall submit a Sprint Performance Report at the conclusion of each sprint. The report shall include, as a minimum:
The Sprint Performance Report shall provide the supporting evidence required by NCIA to assess the completed sprint deliverables against the acceptance criteria.
3.5.2 Service Performance Report
The Contractor shall submit a monthly Service Performance Report providing NCIA with the information necessary to assess the overall delivery of the Engineering Support Services, contractual performance and payment.
The Service Performance Report shall include, as a minimum:
a. Executive Summary
b. Service Performance
The Service Performance Report shall provide a management-level summary of the Sprint Performance Report and shall form the basis for the contractual performance assessment and payment determination.
3.5.3 Reporting Obligations
The Contractor shall ensure that all reports are completed and submitted no later than the fifth (5th) working day following the end of the respective reporting period, unless otherwise agreed.
All reports shall be:
NCIA reserves the right to request clarification of reported data, validate reported information against supporting records, and require corrective actions in the event of discrepancies or deficiencies.
3.6 Governance Model
The Contractor shall establish and operate a structured Governance Model to ensure effective oversight, control, coordination, and continuous improvement of the services delivered under this Statement of Work.
The Governance Model shall:
3.6.1 Governance Structure
The governance structure shall include the following levels:
Sprint Planning Meeting: Focus: NCIA establishes sprint priorities, objectives, required deliverables and acceptance criteria. The Contractor presents the proposed Sprint Plan, including the implementation approach, technical activities, dependencies, risks and milestones for the upcoming sprint. Frequency: Monthly.
Sprint Progress Meeting: Focus: Review progress against the Sprint Plan, engineering activities, technical risks, interoperability matters, testing and validation status, dependencies, issues, mitigation actions and overall delivery progress. Frequency: Weekly.
Sprint Review and Acceptance Meeting: Focus: Review completed sprint deliverables, engineering outcomes, testing and validation results, technical documentation, compliance with the defined acceptance criteria, lessons learned, continuous improvement actions and formally accept completed sprint deliverables where applicable. Frequency: End of each sprint.
Service Performance Review: Focus: Review contractual service performance, KPI achievement, service reporting, continuous improvement activities, service credits (where applicable) and overall service delivery performance. Frequency: Monthly.
3.6.2 Escalation
The Contractor shall establish and maintain effective communication with NCIA throughout the execution of the services. The Contractor shall promptly notify NCIA of any issue, risk, dependency, or event that may adversely affect the delivery schedule, quality of the services, technical compliance, or successful completion of the activities defined in this SoW.
Issues shall be escalated without undue delay where:
3.7 Security Clearance
The assigned personnel by the Contractor shall possess valid NATO-SECRET Personal Security Clearance for the duration of the Period of Performance.
The signature of a Non-Disclosure Agreement between the Contractor and its assigned personnel will be required prior to execution.
3.8 Working Provisions
3.8.1 Place of Performance
The primary place of performance shall initially be offsite and on occasion laboratorial work on NATO sites.
The Purchaser reserves the right to decide and modify the required on-site and remote work ratio during contract execution, based on operational or business requirements.
3.8.2 Hours of Performance
The services shall be performed during standard NCIA working hours from Monday to Thursday from 08:30 until 17:30 and Friday from 08:30 until 15:30.
3.8.3 NCIA-Furnished Property and Services
NCIA shall provide access to necessary tools, data, and NATO networks, subject to applicable Agency policies, security authorisation, and coordination requirements.
NCIA will provide one NATO RESTRICTED REACH laptop computer to the contractor during the execution of the Contract. The Contractor shall return this laptop computer back to NCIA after completion of the Contract.
3.8.4 Travel Requirements
When requested and authorized by the NCI Agency Project Manager, the Wi IMA engineer must be prepared to travel by Car (Vehicle not supplied by NATO), Train and Air to locations advised on a case-by-case basis for business travels (TDY).
These Extraordinary Travel shall be subject to prior written approval by NCIA. Extraordinary Travel expenses will be reimbursed in accordance with Article 5.5 of AAS+ Framework Contract. Such costs will be set as a separate PO line with a not to exceed value to cover and reimburse of actual expenses upon submissions of all receipts and invoices in line with NCIA processes.
All travel arrangements shall be the responsibility of the Contractor.
Overtime, work during weekends and holiday premiums are not permitted for renumeration; overtime, work during weekends or holidays may be permitted but only if agreed with the Purchaser. The individual shall observe local NATO holidays and will not observe his/her traditional national holidays. Access to NATO facilities on weekend or holiday period will only be available at the discretion of local authorities.
Travel requirements (TDY) to locations other than the main location of work shall be authorised in advance by the Purchaser and expenses incurred for travel shall be in addition and billed at a cost not to exceed the price of economy air or first-class rail ticket. The rate of compensation for personal automobile used in travel shall be the same rate as a first-class rail ticket between the point of departure and destination. Expenses will be compensated to the Contractor by the Purchaser on the basis of actual cost of the travel and allowable NATO per diem at the rate of a Level II NATO employee. In no case will the Purchaser make payment for travel/per diem claims without proper support in the form of receipts/cancelled tickets, etc. If travels occur on a non-working day, this day will not be reimbursed at the daily rate specified in the Schedule of Supplies and Service but only under the allowable NATO per diem.
Requests for leave from work and other time off shall be co-ordinated and approved by the NATO Project Manager or Technical Lead in advance. Leave taken shall result in an equivalent credit to the Purchaser for the month in which the leave occurs.
NCIA bears no insurance liability or risk of loss for the contractor’s personnel travel during work or TDYs. Contractor shall be responsible for all insurances of the Contractor/Consultant personnel during the work or TDYs.
4. SERVICE PERFORMANCE
The performance of each assigned personnel shall be measured against the Key Performance Indicators (KPIs) defined in this Section. Performance shall be assessed through the following indicators:
KPI 1 - Sprint Deliverable Acceptance: ensuring that sprint deliverables are completed in accordance with the acceptance criteria established by NCIA and accepted at first submission.
KPI 2 - Timely Delivery of Sprint Deliverables: ensuring that agreed sprint deliverables are submitted within the target delivery dates defined during Sprint Planning.
KPI 3 - Technical Quality and Standards Compliance: ensuring that deliverables comply with the agreed technical requirements, applicable NATO standards, relevant STANAGs and NCIA engineering processes, without requiring Major or Critical corrective actions.
KPI 4 - Reporting and Governance Compliance: ensuring that all contractual reports are submitted on time and support the governance and contractual performance assessment of the Engineering Support Service.
All KPI thresholds, performance monitoring, and associated Service Credits shall be applied as defined in this Section and linked to the reporting and payment mechanism.
4.1 KPI Measurement
The performance of the assigned personnel shall be measured on a monthly basis as follows:
KPI 1 - Sprint Deliverable Acceptance
Frequency: Monthly
Compliant (Met): ≥95% of sprint deliverables are accepted by NCIA at first submission.
Non-Compliant (Not Met): <95% of sprint deliverables are accepted at first submission.
Evidence: Sprint Governance records, Sprint Performance Report.
Low-volume adjustment: For reporting periods with fewer than ten (10) applicable deliverables, one (1) deliverable not meeting the KPI requirement shall not, by itself, result in the KPI being assessed as Non-Compliant, provided that the deficiency is corrected within the timeframe established by NCIA.
KPI 2 - Timely Delivery of Sprint Deliverables
Frequency: Monthly
Compliant (Met): ≥95% of sprint deliverables are submitted by the agreed target delivery dates.
Non-Compliant (Not Met): <95% of sprint deliverables are submitted on time.
Evidence: Sprint Governance records, Sprint Performance Report.
Delays demonstrably resulting from circumstances outside the Contractor's reasonable control shall not be considered, provided that the Contractor has notified NCIA and taken reasonable measures to mitigate the delay.
KPI 3 - Technical Quality and Standards Compliance
Frequency: Monthly
Compliant (Met): ≥95% of deliverables submitted during the reporting period meet the applicable technical requirements, NATO standards, relevant STANAGs and NCIA engineering requirements without requiring significant technical rework.
Non-Compliant (Not Met): <95% of deliverables meet the above requirements without requiring significant technical rework.
Evidence: Sprint Governance records, Sprint Performance Report.
KPI 4 - Reporting and Governance Compliance
Frequency: Monthly
Compliant (Met): 100% of required reports are submitted within the applicable reporting deadlines and provide complete, accurate and sufficiently clear information to support service performance assessment and governance activities, without requiring significant clarification or rework by NCIA.
Non-Compliant (Not Met): One or more required reports are submitted late, are materially incomplete or inaccurate, or require significant clarification or rework before they can be used for service performance assessment.
Evidence: Report submission records, Service Performance Review meeting minutes.
4.2 Service Credits
4.2.1 KPI Weighting
Each KPI shall contribute to the overall service performance as follows:
KPI 1 - Sprint Deliverable Acceptance: 5%
KPI 2 - Timely Delivery of Sprint Deliverables: 4%
KPI 3 - Technical Quality and Standards Compliance: 4%
KPI 4 - Reporting and Governance Compliance: 2%
4.2.2 Calculation of Service Credits
Where a KPI is determined to be Non-Compliant (Not Met) in accordance with Section 4.1, the corresponding percentage specified in Section 4.2.1 shall be applied as a Service Credit. Service Credits shall:
Where one or more KPIs are assessed as Non-Compliant during the applicable reporting period, the corresponding KPI weightings shall be cumulative. The Total Service Credit applicable for the reporting period shall be calculated as follows:
Total Service Credit (%) = Sum of the KPI weightings for all KPIs assessed as non-compliant
The monetary value of the applicable Service Credit shall be calculated as follows:
Service Credit Value = Total Service Credit (%) × Monthly Fee
4.2.3 Cap on Service Credits
The total Service Credits applied in any reporting period shall not exceed fifteen percent (15%) of the applicable monthly service fee.
4.3 Audit and Verification
The Contractor shall ensure that all KPI measurements and service credit calculations are accurate, transparent, and auditable.
The Purchaser reserves the right to:
5. PAYMENT
5.1 Monthly Service Fee
The work carried under this Statement of Work shall be delivered on the basis of a fixed monthly service fee (Monthly Service Fee). The Monthly Service Fee shall cover all costs associated with the delivery of the services, including personnel, management, tools, overheads, and travel as defined in this SoW.
The Monthly Service Fee shall be structured as follows:
Monthly Fixed Fee: equal to eighty-five percent (85%) of the Monthly Service Fee and payable upon acceptance of the services delivered during the applicable reporting period in accordance with Section 3.3.3
Monthly Performance-Based Fee: equal to fifteen percent (15%) of the Monthly Service Fee and payable upon acceptance of the services delivered during the applicable reporting period in accordance with Section 3.3.3 subject to performance assessment against the applicable KPIs defined in Section 4.1 and shall be adjusted through the application of Service Credits in accordance with Section 4.2.
The payable Monthly Performance-Based Fee shall be calculated as follows:
Payable Monthly Performance-Based Fee = Monthly Performance-Based Fee − Service Credit Value
The total monthly payment shall be calculated as follows:
Total Monthly Payment = Monthly Fixed Fee + Payable Monthly Performance-Based Fee
Service Credits shall be applied only to the Monthly Performance-Based Fee and shall not affect the Monthly Fixed Fee, provided that the sprint deliverables have been formally accepted by NCIA.
Where NCIA does not formally accept the sprint deliverables, the Monthly Fixed Fee shall not become payable until the Contractor has satisfactorily corrected the identified deficiencies and the deliverables have been accepted by NCIA in accordance with Section 3.3.3.
5.1.1 Invoicing
The Contractor shall submit one invoice per calendar month in arrears. Each invoice shall:
Payment of the monthly invoice shall be subject to:
NCIA reserves the right to withhold payment of any disputed amounts pending resolution of identified deficiencies, without prejudice to any other contractual rights.
6. PERIOD OF PERFORMANCE
This Statement of Works is expected to commence as soon as possible but no later than 1st October 2026 until 31st December 2026 which is considered the Base Period. The Period of Performance may be extended through the exercise of the following option periods, at the sole discretion of the NCIA:
Year 1: A period of twelve (12) months immediately following the completion of Base Period.
Year 2: A period of twelve (12) months immediately following the completion of Year 1.
Year 3: A period of nine (9) months immediately following the completion of Year 2.
7. REPLACEMENT
Any replacement of the personnel assigned shall be subject to prior written approval by NCIA and shall meet or exceed the qualifications, experience, and security requirements defined for the respective profile. In the event that assigned personnel become unavailable during the Period of Performance, the personnel shall propose a suitable replacement personnel and ensure seamless continuity of the services at no additional cost, including the provision of appropriate knowledge transfer.
The Contractor shall ensure an orderly handover of services both in the case of personnel replacement and at the conclusion of the Period of Performance. This shall include the transfer of all relevant documentation, data, work products, system configurations, and operational procedures necessary to maintain continuity of service delivery. The Contractor shall also provide reasonable support to NCIA and, where applicable, to any follow-on contractor, including clarification of activities and assistance in mitigating disruption.
All transition activities shall be completed within a timeframe agreed with NCIA and in accordance with NCIA instructions. All applicable NCIA Terms and Conditions shall apply.
8. QUALIFICATIONS
[See Requirements]
9. SPECIAL TERMS AND CONDITIONS
All products delivered under this contract shall be property of NATO.
Requirements
3.7 SECURITY CLEARANCE
8. QUALIFICATIONS
8.1 Specific Technical Qualifications
8.2 General Technical Qualifications
8.3 Professional competences
Stop the endless job search. Our AI finds and applies to the best jobs for you.
Featuring 216,738+ Jobs in Others
Answer easy questions
216,738+ jobs across 15+ categories
Get your best job matches
Only hand-screened, legit jobs
Find a remote job faster
No ads, scams, or junk
“I was the first applicant for a remote marketing position that got listed on the company website the same day I applied. Had an interview within 48 hours!”