For Employers

Green Tanner Industrial

Future Opportunities — Office, Project Support & Professional Roles – Datacenter Construction, Industrial Construction, Civil Construction

Posted 3 months ago
2-5 years experience
Apply Now

Please mention DailyRemote when applying

?
Resume Match Score

See how much of this job your resume covers, and what’s missing.

Want a recruiter to go through it line by line?

Get professional review

Create a cover letter for this job

Upload your resume and we draft a letter for this exact role, tailored to what it asks for.

  • Tailored to this role
  • Based on your resume
  • Fully editable
AI Summary

Build a pipeline of qualified candidates for future project management, administrative, and support roles in Texas. Support complex industrial, civil, and mission-critical construction projects through documentation, safety coordination, and project controls.

GTI is expanding into Texas. We are building a pipeline of qualified candidates for future project opportunities across electrical, civil, field leadership, project management, and support roles. This evergreen posting allows us to connect with talented people before specific openings are available so we can move quickly when projects begin. We are looking to start the projects around December and will be in contact with candidates around October and November of this year. 



About Green Tanner Industrial

Green Tanner Industrial Construction is preparing to expand into the Texas market and is building a pipeline of talented professionals who want to be part of high-performing construction teams. We specialize in complex industrial, commercial, electrical, civil, and mission-critical work where safety, quality, reliability, and teamwork matter.

This is a general interest posting for future office, administrative, project support, safety, training, and project management opportunities in Texas. By applying, you will be considered as openings become available that match your background, skills, and career goals.


Possible Future Roles May Include

  • Project Engineer
  • Assistant Project Manager
  • Project Manager
  • Safety Coordinator
  • Workface Planner
  • QA/QC Inspector
  • Administrative Assistant
  • HR, Training, or Compliance Support
  • Procurement, Warehouse, or Logistics Support


What We Look For

We are interested in people who are organized, dependable, safety-minded, and comfortable working in a fast-moving construction environment. Strong candidates may bring experience in:

  • Construction administration or project support
  • Electrical, civil, industrial, commercial, or mission-critical construction
  • Project documentation, RFIs, submittals, change orders, meeting minutes, or closeout packages
  • Preconstruction, takeoffs, scheduling, cost tracking, project controls, or Advanced Work Packaging (AWP)
  • Safety documentation, training records, compliance tracking, or site support
  • Procore, Bluebeam, Microsoft Office, Excel, Smartsheet, Foundation, BambooHR, TalentLMS, or similar systems
  • Communicating with field teams, clients, vendors, subcontractors, and internal departments
  • Supporting work that requires accuracy, urgency, and follow-through


General Requirements

  • OSHA10 minimum required for all on-site roles; OSHA30 required for field leadership roles
  • Strong communication and organization skills
  • Ability to work independently and as part of a team
  • Professional, reliable, and solutions-focused approach
  • Ability to manage competing priorities in a deadline-driven environment
  • Willingness to learn GTI systems, standards, and processes
  • Construction industry experience preferred but not required for all roles


Why Join GTI

At GTI, we believe great work starts with great people. We value employees who take ownership, care about safety, support their teammates, and want to grow. As we expand into Texas, we are looking for people who want to help build something strong from the ground up.


Additional Information

This is an evergreen posting for future opportunities. Submitting an application does not guarantee an immediate opening, but it allows GTI to contact qualified candidates as roles become available.

Green Tanner Industrial Construction is an Equal Opportunity Employer. We consider applicants based on qualifications, experience, and business needs, and we do not discriminate based on protected characteristics under applicable federal, state, or local law. The EEOC identifies protected categories in hiring to include race, color, religion, sex, national origin, age 40 or older, disability, and genetic information, among others.

Automatically Apply to the Best Remote Jobs

Stop the endless job search. Our AI finds and applies to the best jobs for you.

Try it Now
Keep looking

Similar Jobs

See all Remote Support jobs →

Sr.Technical Customer Support Specialist

Full Time Support

Bilingual Help Desk & Client Support Specialist

Full Time Support

(fluent English & Spanish) Customer Support Consultant, Night Shift (remote)

Full Time Support

Application Support & Testing Specialist (Radio Systems)

Freelance India Support

CS Operations Manager II [A], Customer Service

Full Time Brazil Support

Customer Service Representative - Must Reside in Oklahoma

Full Time United States $17 - $25.65 per hour Support
Apply Now

Personalize your Remote Job Search in 3 Easy Steps!

Featuring 218,480+ Jobs in Support

Answer easy questions

Answer easy questions

218,480+ jobs across 15+ categories

Get your best job matches

Get your best job matches

Only hand-screened, legit jobs

Find a remote job faster

Find a remote job faster

No ads, scams, or junk

“I was the first applicant for a remote marketing position that got listed on the company website the same day I applied. Had an interview within 48 hours!”

Sarah J. — Sarah J. · Marketing Manager ★★★★★ Verified