Site Quality Manager (CWI) - Data Center Construction

 Posted 11 hours ago
     
5-10 years experience
Apply Now

Please mention DailyRemote when applying

AI Summary

The Site Quality Manager is responsible for performing weld inspections, managing NDE/NDT reports, and ensuring compliance with project quality assurance plans. They will also execute root cause analysis and corrective action reports to maintain high construction standards.

About You 
Are you knowledgeable about quality and safety regulations in construction environments? Do you engage and advise job site leadership regarding quality programs and best practices? If this sounds like you, then you should mull over a career with Mullins Mechanical.   

 

We are looking for an experienced, self-motivated Site Quality Manager to join our growing team in Jackson, MS.  This position will involve working outside in extreme weather conditions, exposure to loud noises and abnormal odors, confined space work, and working in areas with overhead activities.   

 
Our Commitment 
Our commitment to excellence in safety, quality, customer service, and professionalism has earned us a top-notch reputation in the industry.  Built on client relationships, our project teams are committed to providing services with integrity that will uphold our prestige within the industry. 
 

We realize that our greatest asset is our people.  We offer competitive compensation and benefits packages that include medical, dental, vision, life, disability, paid holidays, paid vacation, and 401K. 
 
Responsibilities 

  • Weld Map Isometric drawings using computer software programs. 
  • Enter welding and inspection information into the tracking tool. 
  • Assist with pressure testing plans and functions. 
  • Review and File NDE/NDT Reports 
  • Work with NDE personnel for planning and execution of work 
  • Assemble and review project documentation packages. 
  • Perform and document inspections based on drawings, specifications, and procedures to determine compliance. 
  • Test welders and perform weld inspections under varies codes. 
  • Review client requirements and ensure specifications are met. 
  • Follow Project Quality Assurance Plans. 
  • Follow inspection and test plans (I&TP’s) 
  • Committed to Mullins core values and safety policies. 
  • Plan and execute Root Cause Analysis’ and Corrective Action Reports 

 
Qualifications 

  • 7+ years of experience as a Quality Manager 
  • Extensive knowledge of codes and standards (ASME, AWS, ACI, AISC, NACE) 
  • Experience with the verification of mechanical equipment alignment 
  • Have a current AWS CWI and/or ASNT VT II and/ or API 510/570 
  • Extensive knowledge of NDT methods (UT, MT, PT, RT) 
  • Understanding of ASTM standards and materials 
  • Efficient in Microsoft Excel, Word, and/ or Project management software (Procore) 
  • Ability to communicate effectively with co-workers. 
  • Excellent interpersonal written and verbal communication skills 
  • High level of organizational skills 
  • Extensive knowledge of reading and understanding drawings 
  • Self-motivated with the drive to learn and grow. 

 
JoinUs 
Mullins Mechanical ranked #1,475 on the 2023 Inc. 5000 list and we’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor specializing in design-build applications, HVAC systems, plumbing, process piping systems, boiler and chiller systems, equipment installation and rigging, plant relocation and maintenance, and metal fabrication. Our projects are often in industrial and manufacturing environments such as manufacturing facilities, automotive plants, chemical plants, distribution centers, warehouses, and other large commercial facilities. 

 

Join Us
Mullins Mechanical ranked #243 on the 2024 ENR Top Specialty Contractors list, #48 in the Nation and #5 in the Southeast among Firms in Mechanical. We’re proud to be one of the fastest growing privately held companies in America. We’re a self-performing specialty contractor specializing in design-build applications, HVAC systems, plumbing, process piping systems, boiler and chiller systems, equipment installation and rigging, plant relocation and maintenance, fire protection, and metal fabrication. Our projects are often in industrial and heavy commercial environments such as manufacturing facilities, automotive plants, chemical plants, distribution centers, warehouses, data centers, and other large facilities.

Similar Jobs

See all Remote Others jobs →

Personalize your Remote Job Search in 3 Easy Steps!

Discover remote opportunities in Others

Answer easy questions

Answer easy questions

200,000+ jobs across 15+ categories

Get your best job matches

Get your best job matches

Only hand-screened, legit jobs

Find a remote job faster

Find a remote job faster

No ads, scams, or junk

I was the first applicant for a remote marketing position that got listed on the company website the same day I applied. Had an interview within 48 hours!

Sarah J. — Sarah J. · Marketing Manager ★★★★★ Verified